EMMA Reports
|
Number |
Title |
Author(s) |
Date |
Status |
| General | ||||
| 005 | ICFA Beam Dynamics Newsletter 43 - mainly devoted to FFAGs, including EMMA | C.Prior et al | Aug 07 | Complete |
| 004 | EMMA Technical Requirements Specification | N.Bliss et al | In preparation | |
| 003 | CONFORM Project Execution Plan | N.Bliss et al | In preparation | |
|
002 |
EMMA - The World's First Non-Scaling FFAG (PAC07 paper) | R.Edgecock | 19-Nov-07 | Complete |
| 001 | Document Naming Convention for the CONFORM Project | H.Owen, N.Bliss | 12-Jan-07 | Complete |
|
Accelerator Physics |
||||
| 013 | Commissioning plan (maybe included in 005?) | ? | Expected | |
| 012 | Matching ALICE to EMMA | ? | Expected | |
| 011 | Diagnostics beamline | B.D. Muratori | Expected | |
| 010 | Orbit Correction | D. Kelliher | 3 June 08 | Complete |
| 009 | Ring impedance estimate | S. Koscielniak | 5 June 07 | Complete |
| 009 | Injection and extraction studies | S.I. Tzenov | Expected | |
| 008 | Lattice studies with FFEMMAG code | S.I. Tzenov | Expected | |
| 007 | Window option in injection line | F. Jackson | Complete | |
| 006 | Injection line design | B.D. Muratori, C. Johnstone, T. Yokoi | Expected | |
| 005 | Beam Loading Effects in EMMA and Commissioning Strategy | S.Machida | 11-Jan-08 | Complete |
| 004 | Direct Space Charge Effects in EMMA | S.Machida | 11-Jan-08 | Approved |
| 003 | EMMA parameters | B.Muratori, S.Tzenov | In preparation | |
| 002 | S.Koscielniak | 26-Sep-07 | Approved | |
| 001 | The EMMA Main Ring Lattice | J.S.Berg | 11-Jul-08 | Approved |
| Building | ||||
| Controls & Power Supplies | ||||
| 001 | EMMA Device Naming Convention | B.Martlew | 8-Feb-08 | Complete |
| Diagnostics | ||||
| 003 | EMMA Diagnostics | R.J. Smith | Expected | |
| 002 | Electro-optic bunch length measurement | S.P. Jamison | Expected | |
| 001 | EMMA Ring BPM Resolution at Low Charge | A. Kalinin | Complete | |
| Electrical Engineering | ||||
| 003 | Ring magnet power converter options | S.A. Griffiths | Complete | |
| 002 | RF power supply prototype | S.A. Griffiths | Expected | |
| 001 | Kicker Power Supply prototype | S.A. Griffiths | Expected | |
| Magnets | ||||
| 005 | Kicker Magnet Design | K. Marinov | In preparation | |
| 004 | Septum Magnet Design | K. Marinov | In preparation | |
| 003 | D Magnet Clamp Plate Slots | B.J.A. Shepherd | Oct 08 | Complete |
| 002 | Ring Quadrupole Magnet Prototype Testing | B.J.A. Shepherd | Aug 08 | Complete |
| 001 | Ring Quadrupole Magnet Design | B.J.A. Shepherd, N. Marks | Feb 08 | Complete |
| Mechanical Engineering | ||||
| 001 | B.Fell | 22-Aug-07 | Complete | |
| RF | ||||
| 004 | Low level RF | C.D. Beard | Expected | |
| 003 | RF distribution | C.D. Beard | Expected | |
| 002 | RF power source and power supply options | C.D. Beard | Expected | |
| 001 | RF Cavity Design | E. Wooldridge, C.D. Beard | Expected | |
| Services | ||||
| Safety | ||||
| Vacuum | ||||
| Resources | ||||
| Risk | ||||